Gear released months early
In-house engineering locks ratings and one-line topology before drawings finish, so 40–60 week switchgear lead times land inside your schedule, not behind it.
FLAGSHIP VERTICAL
PowerBoy Electrical Services builds the complete electrical scope for hyperscale, colocation, and edge data centers — medium-voltage distribution, paralleling switchgear, generator and UPS plants, busway, and white-space fit-out — self-performed across Texas and nationally, typically at $3.50–$6.50 per critical watt.
Self-performance is the difference between promising a date and controlling one. These scopes stay on our payroll:
Utility interconnection to the last whip. Dual sources, 2N paralleling, and UPS distribution engineered, installed, and commissioned by one contractor — one throat to choke on the schedule.
In-house engineering locks ratings and one-line topology before drawings finish, so 40–60 week switchgear lead times land inside your schedule, not behind it.
Whips, racks, tray assemblies, and skids built in our shop while the site is still concrete — field crews install instead of fabricate.
We staff Cx support from Level 1 receipt through integrated systems testing, and our QA/QC documentation package is turnover-ready from day one.
Texas-based with the licensing, workforce planning, and travel crews to follow data center clients into any market.
Send the one-line and the schedule. A master electrician — not a salesperson — walks the scope with you, usually within one business day.